
Featured Works
S-135 By-Pass Culvert and Dike Repairs
The project involves repair of two 96” diameter Corrugated Metal Pipe (CMP) culverts under the Herbert Hoover Dike at the Structure S-135 Pump Station.
The project involves repair of two 96” diameter Corrugated Metal Pipe (CMP) culverts under the Herbert Hoover Dike at the Structure S-135 Pump Station.
Date: Saturday, January 21st, 2022 | 11AM
Place: St. Cloud, FL 34741
Date: Saturday, November 19th, 2022 | 10am (ET)
Date: Saturday, November 12th, 2022 | 9AM
Place: Kissimmee Lakefront Park
Spoonbill Pavilion
201 Lakeview DR, Kissimmee, FL 34741